How a Cubexy ADU Gets Built, From Survey to Move-In
From First Touch to Move-In – a faster, smoother building process with less noise, less disruption, and more peace of mind.
Step 1
Site Survey
Before anything else happens, we come to your lot – not the other way around. We check zoning, setbacks, and utility access, and tell you honestly what's possible and what isn't before you've spent a dollar on design.

Step 2
Design & Model Selection
Choose your favorite model and finishes, or let us create something unique just for you!

Step 3
Permitting
We take care of the permitting process with your city, so you don't have to worry about the paperwork. Thanks to our modular construction process and streamlined documentation, we can often move through approvals faster than traditional construction.

Step 4
Factory Build
Your home is built indoors at our production facility, protected from the weather and the delays that come with traditional on-site construction. Our dedicated team oversees every step of the process, ensuring consistent quality, timely completion, and personal attention to every detail.

Step 5
Delivery & Install
Your finished home is delivered to your property and carefully placed onto its prepared foundation using a crane.

Step 6
Move-In
Once everything is in place, we take care of the final touches and walk you through your new home to make sure every detail is just right.

30%
Faster than regular construction! And immeasurably less disruptive.
Prefer to Manage Your Own Site Work?
Some customers already have a contractor and want to handle foundation and site prep themselves. We build and deliver your Cubexy as a standalone unit – here's what your contractor will need to coordinate directly: utilities (water, sewer, electrical connections) and foundation preparation matched to your model's specs.